Post-Production Delivery Night Checklist
Who it's for: Post supervisors, assistant editors, deliverables coordinators, and facility ops owning overnight client handoffs.
When to use: Use before sending dailies, masters, EXR sequences, ProRes/MXF packages, IMF-adjacent sets, or project archives under a hard client or vendor deadline.
TeraAirlift
Delivery checklist
Post-Production Delivery Night Checklist
Who it's for: Post supervisors, assistant editors, deliverables coordinators, and facility ops owning overnight client handoffs.
When to use: Use before sending dailies, masters, EXR sequences, ProRes/MXF packages, IMF-adjacent sets, or project archives under a hard client or vendor deadline.
01Before you package
- ☐Confirm the deliverable list against the latest client/vendor spec (not last week’s Slack thread)
- ☐Name a single delivery owner for the night — who owns ETA and who escalates
- ☐List every outbound package with priority (must-arrive vs nice-to-have)
- ☐Note review call / acceptance time in local and recipient time zones
- ☐Confirm who must accept the package before wider stakeholders are notified
02Package readiness
- ☐Confirm final deliverable set and naming convention matches facility/client convention
- ☐Exclude scratch, cache, renders-in-progress, and temp media from the package
- ☐Verify media, EDLs/AAFs/XMLs, and sidecars that belong together stay in one tree
- ☐Spot-check a sample file opens in the intended app before upload starts
- ☐Note approximate package size (GB/TB) and expected recipient count
- ☐Record destination expectations (download folder, cloud drop, review platform)
03Bandwidth & timing
- ☐Estimate upload duration at realistic suite bandwidth (not lab peak numbers)
- ☐Add buffer for recipient download time before the review call
- ☐Avoid starting multi-hour uploads with less than 2× estimated window remaining
- ☐Check whether other facility transfers will compete for the same pipe tonight
- ☐If shipping drives is Plan B, stage drives now — don’t invent courier logistics at 2 AM
04Queue plan
- ☐List outbound jobs in priority order for the night
- ☐Identify which packages can run in parallel without starving the critical path
- ☐Assign an owner watching the queue, ETA, and stall alerts
- ☐Document the fallback if a transfer stalls after ~50%
- ☐Decide in advance what gets cancelled if the window collapses
- ☐Leave a short handoff note for the next shift if the night spans operators
05Communication before send
- ☐Tell primary recipients when to expect availability and how they will access it
- ☐Confirm preferred contact for stalls (phone/Slack/email) before upload starts
- ☐Align with producers on what “delivered” means (upload complete vs verified download)
- ☐Warn stakeholders if a package is review-only vs final master to avoid wrong assumptions
06Failure / retry plan
- ☐If upload stalls: pause dependent review until retry succeeds — do not declare ready
- ☐Do not open a second uncontrolled share link (WeTransfer/Dropbox/personal drive) as a silent backup
- ☐Escalate when remaining window is under ~40% of estimated handoff time
- ☐Capture what failed (network, storage, auth, wrong package) for the postmortem
- ☐If you must split packages mid-flight, record version IDs so recipients don’t mix halves
- ☐Notify the review owner as soon as ETA slips past the call buffer — early beats surprise
07Recipient / access plan
- ☐Confirm primary recipient emails and any approved forwards before send
- ☐Set expire-after window for client review packages (don’t leave masters open indefinitely)
- ☐Use recipient-only access for finals; avoid anonymous links for masters
- ☐Remove temporary vendor/freelancer access after acceptance
- ☐Record who can still download after the producer’s business hours
- ☐Keep internal suite copies separate from the client-facing delivery path
08Verification plan
- ☐Confirm transfer completed with integrity check (hash) when available
- ☐Recipient confirms package opens and expected folders/media exist
- ☐Spot-check duration, frame count, or file count against the delivery sheet
- ☐Log delivery timestamp, package identifier, and who accepted
- ☐Only then notify wider stakeholders that review can start
- ☐Archive the send record so disputes don’t rely on memory or chat search